We have now launched the latest training schedule for the month of May, June & July 2012. A wide number of technical training programs are available that run all year round, some of which are ASNT UT, API 570 Piping Inspector, AWS-CWI Certified Welding Inspector and ASNT PT (Liquid Penetrant Testing) Level II.
May
-
ASNT UT (Ultrasonic Testing) Level II Training Program (Part Time)
Full Time: 28 May 2012 to 29 Jun 2012
June
-
BGAS Painting Course
Full Time: 01Jun 2012 to 05 Jun 2012
-
ASNT PT (Liquid Penetrant Testing) Level II Training Program
Part Time: 18 Jun 2012 to 27 Jun 2012
Full Time: 25 Jun 2012 to 27 Jun 2012
-
ASNT MT (Magnetic Particle Testing) Level II Training Program
Full Time: 28 Jun 2012 to 30 Jun 2012
-
PCN RI Level II
Full Time: 18 Jun 2012 to 22 Jun 2012
-
CSWIP 3.1 Level II (Welding Inspector)
Full Time: 18 Jun 2012 to 22 Jun 2012
-
CSWIP 3.2 Level III (Senior Welding Inspector)
Full Time: 25 Jun 2012 to 29 Jun 2012
July
-
AWS to CSWIP Bridging
Full Time: 02 Jul 2012 to 04 Jul 2012
-
ASNT UT (Ultrasonic Testing) Level II Training Program
Full Time: 02 Jul 2012 to 13 Jul 2012
-
AWS-CWI (Certified Welding Inspector) Training Program
Part Time: 09 Jul 2012 to 03 Aug 2012
Full Time: 23 Jul 2012 to 31 Jul 2012
-
CSWIP 3.0 Level I (Visual Welding Inspector) Training Program
Full Time: 10 Jul 2012 to 12 Jul 2012
-
ASNT RT (Radiographic Testing) Level II Training Program
Full Time: 16 Jul 2012 to 27 Jul 2012
-
CSWIP 3.1 Level II (Welding Inspector) Training Program
Full Time: 23 Jul 2012 to 27 Jul 2012
-
Lifting Equipment Inspection Training Program (Level I & II)
Full Time: 28 Jul 2012 to 06 Aug 2012
-
API 570 Piping Inspector Training Program
Part Time: 30 Jul 2012 to 28 Aug 2012
|
|
May Schedule
ASNT UT (Ultrasonic Testing) Level II Training Program (Part Time)
ASNT UT (Ultrasonic Testing) Level II course is from 28 May 2012 to 29 Jun 2012. This course covers the use of ultrasonic transmission of high-frequency sound waves into a material to detect any imperfections or locate any changes in material properties. The most commonly used ultrasonic testing technique is pulse echo, wherein sound is introduced into a test object and reflections (echoes) are returned to a receiver from internal imperfections or from the part's geometrical surfaces.
Contents
Fundamentals
- Ultrasonic Sound Beams
- Wave Travel Modes
- Refraction, reflection, scattering and attenuation
- Transducers and Sound Beam Coupling
Ultrasonic Testing
- Basic types of equipment
- Reference Standards
- Test results interpretation; discontinuity indications
- System Factors
Applications
- Flaw Detection
- Thickness Measurement
- Bond Evaluation
- Process Control
- Field Inspection
Exam certification
-
As per ASNT-SNT-TC-1A 2006
June schedule
BGAS Painting Course
Full Time:01 Jun 2012 to 05 Jun 2012
Corrosion theory; surface preparation; surface contaminants and tests; paint constituents and technology; solutions and dispersions; drying and curing properties and performance; specified painting conditions; cathodic protection; holiday/pinhole detection; paint-application methods; paint/paint film testing; paint identification; metal coatings; paint faults; colour; inspection methods; specification requirements; health and safety and working practices.
ASNT PT (Liquid Penetarnt Testing) Level II Training Program
Part Time: 18 Jun 2012 to 27 Jun 2012
Full Time: 25 Jun 2012 to 27 Jun 2012
In the Liquid Penetrant Testing (PT) Test objects are coated with visible or fluorescent dye solution. Excess dye is then removed from the surface, and a developer is applied. The developer acts as blotter, drawing trapped penetrant out of imperfections open to the surface. With visible dyes, vivid color contrasts between the penetrant and developer make "bleedout" easy to see. With fluorescent dyes, ultraviolet light is used to make the bleedout fluoresce brightly, thus allowing imperfections to be readily seen.
ASNT MT (Magnetic Particle Testing) Level II Training Program
Full Time: 28 Jun 2012 to 30 Jun 2012
The Magnetic Particle NDE method is accomplished by inducing a magnetic field in a ferromagnetic material and then dusting the surface with iron particles (either dry or suspended in liquid). Surface and near-surface imperfections distort the magnetic field and concentrate iron particles near imperfections, previewing a visual indication of the flaw.
PCN RI Level II
Full Time: 18 Jun 2012 to 22 Jun 2012
Radiography NDT method involves the use of penetrating gamma or X-radiation to examine parts and products for imperfections. An X-ray generator or radioactive isotope is used as a source of radiation. Radiation is directed through a part and onto film or other imaging media. The resulting shadowgraph shows the dimensional features of the part. Possible imperfections are indicated as density changes on the film in the same manner as a medical X-ray shows broken bones.
CSWIP 3.1 Level II (Welding Inspector)
Full Time: 18 Jun 2012 to 22 Jun 2012
Welding procedures: Establishing that a procedure is available, has been approved as required by the appropriate authority and is being employed in production. Witnessing of welder and procedure approval tests: Witnessing the preparation of test pieces and destructive tests, and verifying compliance with appropriate standards and specifications. Welder approvals: Verification that adequate and valid welder approvals are available, and that only approved welders as required are used in production. Post weld heat treatment :Verification that post weld heat treatment has been conducted in accordance with specification requirements. Reports: Preparation of inspection reports.
CSWIP 3.2 Level III (Senior Welding Inspector)
Full Time: 25 Jun 2012 to 29 Jun 2012
Certification of compliance: Final acceptance and certification that the requirements of the specification have been met. Weld drawings: Interpretation of weld drawings and weld symbols. Records: Maintenance of comprehensive inspection records. Weld defects: Appreciation of the factors influencing the formation of weld defects and their acceptability in relation to the written specification. NDT results: Verification of NDT reports on welding work for which the Senior Welding Inspector is responsible. This may include radiographic interpretation. Quality assurance:
Ensuring that quality assurance standards and procedures are maintained.
July schedule
AWS to CSWIP Bridging
Full Time: 02 Jul 2012 to 04 Jul 2012
The training modules have been set up to provide training and instruction in the requirements for the bridging examination for present holders of AWS CWI (Certified Welding Inspector) requiring CSWIP 3.1 approval and Welding Inspector certification
ASNT UT (Ultrasonic Testing) Level II Training Program
Full Time: 02 Jul 2012 to 13 Jul 2012
Ultrasonics NDT method use transmission of high-frequency sound waves into a material to detect imperfections or to locate changes in material properties. The most commonly used ultrasonic testing technique is pulse echo, wherein sound is introduced into a test object and reflections (echoes) are returned to a receiver from internal imperfections or from the part's geometrical surfaces.
AWS-CWI (Certified Welding Inspector) Training Program
Part Time: 09 Jul 2012 to 03 Aug 2012
Full Time: 23 Jul 2012 to 31 Jul 2012
The course will serve as a sound refresher in welding inspection, particularly for practicing welding inspectors and anyone want to be an AWS-certified welding inspector. The main emphasis is on what a professional welding inspector should know in actual practice. Course participants will undergo a rigorous course to get them well versed with the codes/standards in use, the fundamentals of welding inspectors, and actual hands-on examinations of weld replicas with various inspection tools.
CSWIP 3.0 Level I (Visual Welding Inspector) Training Program
Full Time: 10 Jul 2012 to 12 Jul 2012
This welding inspection course covers: visual inspection procedures; relevant codes of practice, terms and definitions; welding processes and typical welding defects; weld measurements; typical documentation and requirements; practical inspection and reporting
ASNT RT (Radiographic Testing) Level II Training Program
Full Time: 16 Jul 2012 to 27 Jul 2012
Radiography NDT method involves the use of penetrating gamma or X-radiation to examine parts and products for imperfections. An X-ray generator or radioactive isotope is used as a source of radiation. Radiation is directed through a part and onto film or other imaging media. The resulting shadowgraph shows the dimensional features of the part. Possible imperfections are indicated as density changes on the film in the same manner as a medical X-ray shows broken bones
CSWIP 3.1 Level II (Welding Inspector) Training Program
Full Time: 23 Jul 2012 to 27 Jul 2012
Welding procedures: Establishing that a procedure is available, has been approved as required by the appropriate authority and is being employed in production. Witnessing of welder and procedure approval tests: Witnessing the preparation of test pieces and destructive tests, and verifying compliance with appropriate standards and specifications. Welder approvals: Verification that adequate and valid welder approvals are available, and that only approved welders as required are used in production. Post weld heat treatment :Verification that post weld heat treatment has been conducted in accordance with specification requirements. Reports: Preparation of inspection reports.
Lifting Equipment Inspection Training Program (Level I & II)
Full Time: 28 Jul 2012 to 06 Aug 2012
The safety of Lifting equipment and Gears plays a vital role in all the sectors. The lack of competent person in the industry is an ever growing concern. Cutech as an organisation committed to integrity and safety of equipment provides comprehensive training programme which cover every aspect, from design, manufacture, assembly, and testing of lifting equipment. The investments in the up gradation of the workforce are the best for any organisation to increase the quality and Safety standard. Cutech courses are taken by certified and competent personnel This Course helps for the candidates who are willing to take LEEA Training and Certification Exams.*
Part 1 is a basic entry course to understand about lifting equipment. Part 1 is a compulsory course before taking any of the diploma courses (Part 2,3,5).It includes basic information regarding Manufacturing, inspection, maintenance and testing of the lifting equipment.Part 2(Lifting Gear general) is a diploma course which gives complete outlook on all the Lifting Gears (or Lifting accessories like slings, shackles, hooks etc;). Its moreover like a specialization.
API 570 Piping Inspector Training Program
Part Time: 30 Jul 2012 to 28 Aug 2012
The API 570 Piping Inspector training course is structured in such way to give a detailed understanding of the required engineering knowledge for API 570 In-service Piping Inspection and provide required preparation in the form of lectures by experts and model examination for attaining the API 570 In-service Piping Inspection Certification.
|